Inglewood & Allendale Multi-plexes

Location: Edmonton, AB

Duration: May. 2025 – Present

Role: Electrical engineering, mechanical engineering

Juchli Engineering team members worked on various multi-family buildings with Frank Hilbich Architects, ranging from 6-8 units. Inglewood, Allendale, and Amisk multi-plexes are currently in construction. The suites utilize fresh air heat recovery and gas furnace with electric split heat pump combinations, as well as a full wet-pipe sprinkler system throughout.