
Location: Edmonton, AB
Duration: Jan. 2026 – June 2026
Role: Electrical engineering, Mechanical engineering
A tenant improvement involving the install of a full commercial cooking kitchen in the back area, with fresh air ventilation and exhaust, fire protection, plumbing with grease interception, and domestic water heating. The front dining area was treated with separate ventilation and temperature control, as well as fire protection, lighting, alarms, and ventilation and plumbing for the washroom areas.
